3/24/2024 Illinois residential appliance installer license prep class download the last version for windowsRead Now![]() Public improvements will not be accepted until all public right-of-ways have permanent ground surface cover and all other areas (not under construction) have at least temporary seeding unless ground and weather conditions prevent establishment of the permanent ground cover. "Within seven (7) days after completion of construction and soil conditions are suitable, and before final inspection, the development must have permanent seeding or other ground cover planted or installed. Section 13.06 of the City of Bloomington Manual of Practice for the Design of Public Improvements currently states: Factors to be considered on review shall include, but need not be limited to, the effects of the proposed development activities on the surface water flow to tributary and downstream lands, any comprehensive watershed management plans, or the use of any retention facilities possible saturation of fill and unsupported cuts by water, both natural and domestic runoff surface waters that produce erosion and silting of drainage ways nature and type of soil or rock which when disturbed by the proposed development activities may create earth movement and produce slopes that cannot be landscaped and excessive and unnecessary scarring of the natural landscape through grading or removal of vegetation. The appeal will be heard by the Construction Board of Appeals after the appropriate fees and paperwork have been filed. ![]() This section is meant to allow any entity which feels aggrieved by the Director of Public Works' decision regarding permit issuance or revocation the right to file an appeal. Water Infrastructure Master Plan & Rate Study. ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |